Location

Oxfordshire

Scope

Building Contractor client requires design stage building compliance support. GDR creates a baseline SBEM model using design builder with some basic elevation and GA drawings. Recommendations for insulation and cladding spec for shell. Recommend changes to hot water heating system and roller shutter doors. Air testing snagging report and ‘passed first time’ formal air test achieving 3. EPC from SBEM achieved A energy rating for all 17 units. No solar PV required.

Delivery

  • L5 commercial energy assessor
  • Design builder & SBEM
  • Commercial air testing team
  • GDR coordination